{"id":3096,"date":"2016-04-21T00:00:00","date_gmt":"2016-04-21T00:00:00","guid":{"rendered":"http:\/\/otava.test\/lessons-learned-from-bringing-a-new-ups-online\/"},"modified":"2016-04-21T00:00:00","modified_gmt":"2016-04-21T00:00:00","slug":"lessons-learned-from-bringing-a-new-ups-online","status":"publish","type":"post","link":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/","title":{"rendered":"Lessons learned from bringing a new UPS online"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-16379\" style=\"margin-left: 15px;\" src=\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\" alt=\"UPS data centers\" width=\"350\" height=\"263\" \/>This month, we brought a UPS (Uninterruptible Power Supply) online at our <a href=\"https:\/\/www.onlinetech.com\/data-centers\/michigan-data-centers\/mid-michigan-data-center\" target=\"_blank\" rel=\"noopener noreferrer\">Mid-Michigan data center.<\/a> We maintain an N+1 redundancy configuration there and\u00a0with the rapid growth in the amount of data we were hosting, we brought another UPS online to help carry the load and maintain our redundancy.<\/p>\n<p>In order to make this a successful event, there was a lot that had to be done.\u00a0There were four different vendors onsite to help bring the UPS online. This involved switching over to generator power, bypassing the current UPS systems, testing the new UPS and bringing everything back to normal operations.<\/p>\n<p>It may sound simple but\u00a0it\u2019s a long, arduous and potentially dangerous task to complete.\u00a0There are\u00a0risks from equipment shorts that not only can affect the systems that house\u00a0critical data, but physical dangers from electrocution, arc flashes, shrapnel and molten metal. This isn\u2019t a task to take lightly, and there were over\u00a025 steps total that had to be performed\u00a0to complete the work safely.<\/p>\n<p>First, the electric load was switched to generator power to safely maintain clients&#8217; critical systems during the entire testing process.\u00a0After that was done, the UPS systems were bypassed internally and externally and\u00a0taken\u00a0offline. Since we hadn&#8217;t used this UPS before, we wanted to make sure it was in proper working order first, and we wanted to test it without endangering the load of the other UPS systems. After it was tested successfully, all the systems were brought back online\u00a0and returned to normal operations.\u00a0All of this had to be done without losing power to the\u00a0critical servers that are hosted in the data center.<\/p>\n<p>If you own your own UPS\u00a0system, this is something you&#8217;ll almost certainly need outside help for.\u00a0That labor and expertise doesn\u2019t come cheaply, either. To operate and maintain a system similar to our 1500 KW one, you can expect to easily pay\u00a0upwards of one million dollars.<\/p>\n<p>Do you have the money, time and staff to add more power? Even if you have what you need, is it the best use of your budget?<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-16379\" src=\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-1.jpg\" alt=\"UPS maintenance\" width=\"350\" height=\"263\" \/>This is a lot for any business to worry about, especially those who aren\u2019t in the business of electrical engineering. This is why\u00a0leveraging the resources of a <a href=\"https:\/\/www.onlinetech.com\/solutions\/enterprise-hosting\" target=\"_blank\" rel=\"noopener noreferrer\">managed service provider<\/a>\u00a0is so appealing for many businesses.\u00a0It&#8217;s their job to\u00a0worry about all of that for you.<\/p>\n<p>Our process lasted from about 11:30 PM to 4 AM. It was a late night for our staff and vendors, but we are happy to report we now have the power capacity to serve our clients for many years to come!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there and\u00a0with the rapid growth in the amount of data we were hosting, we brought another UPS online to help carry the load and maintain our redundancy. In order to make this a successful event, there was a lot that had to be done.\u00a0There were four different vendors onsite to help bring the UPS online. This involved switching over to generator power, bypassing the current UPS systems, testing the new UPS and bringing everything back to normal operations. It may sound simple but\u00a0it\u2019s a long, arduous and potentially dangerous task to complete.\u00a0There are\u00a0risks from equipment shorts that not only can affect the systems that house\u00a0critical data, but physical dangers from electrocution, arc flashes, shrapnel and molten metal. This isn\u2019t a task to take lightly, and there were over\u00a025 steps total that had to be performed\u00a0to complete the work safely. First, the electric load was switched to generator power to safely maintain clients&#8217; critical systems during the entire testing process.\u00a0After that was done, the UPS systems were bypassed internally and externally and\u00a0taken\u00a0offline. Since we hadn&#8217;t used this UPS before, we&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"other_category":[],"class_list":["post-3096","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.2 (Yoast SEO v27.2) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Lessons learned from bringing a new UPS online | OTAVA<\/title>\n<meta name=\"description\" content=\"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lessons learned from bringing a new UPS online\" \/>\n<meta property=\"og:description\" content=\"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\" \/>\n<meta property=\"og:site_name\" content=\"OTAVA\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-21T00:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\" \/>\n<meta name=\"author\" content=\"Irma Brillantes\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Irma Brillantes\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\"},\"author\":{\"name\":\"Irma Brillantes\",\"@id\":\"https:\/\/www.otava.com\/#\/schema\/person\/35774075f8f4fcdd4eae80cb72034263\"},\"headline\":\"Lessons learned from bringing a new UPS online\",\"datePublished\":\"2016-04-21T00:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\"},\"wordCount\":450,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.otava.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\",\"url\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\",\"name\":\"Lessons learned from bringing a new UPS online | OTAVA\",\"isPartOf\":{\"@id\":\"https:\/\/www.otava.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\",\"datePublished\":\"2016-04-21T00:00:00+00:00\",\"description\":\"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage\",\"url\":\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\",\"contentUrl\":\"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.otava.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lessons learned from bringing a new UPS online\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.otava.com\/#website\",\"url\":\"https:\/\/www.otava.com\/\",\"name\":\"OTAVA\u00ae\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.otava.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.otava.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.otava.com\/#organization\",\"name\":\"OTAVA\u00ae\",\"url\":\"https:\/\/www.otava.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.otava.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.otava.com\/wp-content\/uploads\/2025\/03\/otava-logo.svg\",\"contentUrl\":\"https:\/\/www.otava.com\/wp-content\/uploads\/2025\/03\/otava-logo.svg\",\"caption\":\"OTAVA\u00ae\"},\"image\":{\"@id\":\"https:\/\/www.otava.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.otava.com\/#\/schema\/person\/35774075f8f4fcdd4eae80cb72034263\",\"name\":\"Irma Brillantes\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g\",\"caption\":\"Irma Brillantes\"},\"url\":\"https:\/\/www.otava.com\/blog\/author\/ibrillantesotava-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Lessons learned from bringing a new UPS online | OTAVA","description":"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/","og_locale":"en_US","og_type":"article","og_title":"Lessons learned from bringing a new UPS online","og_description":"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.","og_url":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/","og_site_name":"OTAVA","article_published_time":"2016-04-21T00:00:00+00:00","og_image":[{"url":"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg","type":"","width":"","height":""}],"author":"Irma Brillantes","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Irma Brillantes","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#article","isPartOf":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/"},"author":{"name":"Irma Brillantes","@id":"https:\/\/www.otava.com\/#\/schema\/person\/35774075f8f4fcdd4eae80cb72034263"},"headline":"Lessons learned from bringing a new UPS online","datePublished":"2016-04-21T00:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/"},"wordCount":450,"commentCount":0,"publisher":{"@id":"https:\/\/www.otava.com\/#organization"},"image":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage"},"thumbnailUrl":"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/","url":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/","name":"Lessons learned from bringing a new UPS online | OTAVA","isPartOf":{"@id":"https:\/\/www.otava.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage"},"image":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage"},"thumbnailUrl":"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg","datePublished":"2016-04-21T00:00:00+00:00","description":"This month, we brought a UPS (Uninterruptible Power Supply) online at our Mid-Michigan data center. We maintain an N+1 redundancy configuration there.","breadcrumb":{"@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#primaryimage","url":"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg","contentUrl":"https:\/\/otava.test\/wp-content\/uploads\/2019\/04\/ups-upgrade-2.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.otava.com\/blog\/lessons-learned-from-bringing-a-new-ups-online\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.otava.com\/"},{"@type":"ListItem","position":2,"name":"Lessons learned from bringing a new UPS online"}]},{"@type":"WebSite","@id":"https:\/\/www.otava.com\/#website","url":"https:\/\/www.otava.com\/","name":"OTAVA\u00ae","description":"","publisher":{"@id":"https:\/\/www.otava.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.otava.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.otava.com\/#organization","name":"OTAVA\u00ae","url":"https:\/\/www.otava.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.otava.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.otava.com\/wp-content\/uploads\/2025\/03\/otava-logo.svg","contentUrl":"https:\/\/www.otava.com\/wp-content\/uploads\/2025\/03\/otava-logo.svg","caption":"OTAVA\u00ae"},"image":{"@id":"https:\/\/www.otava.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.otava.com\/#\/schema\/person\/35774075f8f4fcdd4eae80cb72034263","name":"Irma Brillantes","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5251bebc1699793a698d1a6158603cb3cdc50a095a12357e42d415b3e5546c2?s=96&d=mm&r=g","caption":"Irma Brillantes"},"url":"https:\/\/www.otava.com\/blog\/author\/ibrillantesotava-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/posts\/3096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/comments?post=3096"}],"version-history":[{"count":0,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/posts\/3096\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/media?parent=3096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/categories?post=3096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/tags?post=3096"},{"taxonomy":"other_category","embeddable":true,"href":"https:\/\/www.otava.com\/wp-json\/wp\/v2\/other_category?post=3096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}